There shall be a certification placed upon the final plat from the chief engineer
of the water system after the applicant has complied with the requirements of this
part.
(Ord. No. 30-02, Pt. II, 7-9-02)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');