DeKalb County |
Code of Ordinances |
Chapter 14. LAND DEVELOPMENT |
Article III. SUBDIVISIONS |
Division 4. REQUIRED IMPROVEMENTS |
Part B. Water |
§ 14-312. Certification of final plat. |
§ 14-313. Right of county to design water mains. |
§ 14-314. Materials, location of mains. |
§ 14-315. Fire hydrants. |
§ 14-316. Valves. |
§ 14-317. Stub-out services. |
§ 14-318. Determination of size of mains. |
§ 14-319. Submission of water service data for location of water system. |
§ 14-320. Engineer's or surveyor's certification. |
§ 14-321. Prerequisites to delivery of materials to contractor. |
§ 14-322. Final inspection; cost of labor information to be supplied. |
§ 14-323. Material storage and responsibility. |
§ 14-324. Excavation. |
§ 14-325. Pipe laying. |
§ 14-326. Backfilling. |
§ 14-327. Pavement replacement. |
§ 14-328. Barricades and lights. |
§ 14-329. Testing. |
§ 14-330. Sterilization of mains. |
§ 14-331. Cleanup. |
§ 14-332. Service lateral locations. |
§ 14-333. Maintenance. |
§§ 14-334—14-350. Reserved. |