DeKalb County |
Code of Ordinances |
Chapter 27. ZONING |
Article 3. OVERLAY DISTRICT REGULATIONS |
Appendix 27-3.36 DIVISION 36. SCOTTDALE AREA COMPATIBLE USE OVERLAY DISTRICT |
§ 3.36.19. Final design package review and approval process.
A.
[Final design package.] Upon receiving comments on the conceptual design package, the applicant will submit the final design package for review and approval. The final design package must include full architectural and landscape architectural plans and specifications. The submitted plans must include the following, demonstrating that the final design package is in compliance with all requirements of the Scottdale Overlay District and the underlying zoning classification: a site plan; architectural elevations and sections; rendering depicting the building design, including elevations and architectural details of proposed buildings, exterior materials and colors; and plans and elevations of all hardscape, landscape and signage. The final design package must be signed and sealed by a professional engineer/architect. The final design package must contain all plans, elevations, sections and specifications necessary for obtaining development and building permits. The applicant may submit the final design package simultaneously with the permit application.
B.
Review. The director of planning or designee shall review each application for compliance with all requirements of the Scottdale Overlay District and the underlying zoning classification. Where the director or designee determines that said plans comply with the requirements of the Scottdale Overlay District a certificate of compliance shall be issued in the form of the director or designee's signature on the plans and drawings after which the applicant shall then apply for land disturbance, building or signs permits. Where the director or designee determines that said plans do not comply with the requirements of this chapter, then the director or designee shall notify the applicant in writing stating the manner in which said applicant fails to comply with such requirements. All applications shall be considered and decided by the director of planning or designee within thirty (30) days of receipt of a complete application. Any appeal of the decision in this regard shall be to the zoning board of appeals pursuant to section 7.5.2.
( Ord. No. 15-06 , 8-25-2015)